A timely filing clock per payer, per plan
The deadline is not one number, it does not always start at the date of service, and the denial it produces is unappealable in a way almost no other denial is. It is the one clock worth building properly.
Most denials are a problem. A timely filing denial is a loss. The service was performed, the documentation is fine, the coding is right, and the money is simply gone — and in most cases it cannot be billed to the patient either, because the contract says a claim denied for late filing is the practice's own fault.
It is also the most predictable denial there is. A clock, a deadline, and a queue that empties before the deadline arrives. No clinical judgement, no payer discretion, nothing to interpret. Which makes it the first thing worth building and one of the last things most systems get round to.
The deadline is a function, not a field
Four inputs decide it:
The window. How long the payer allows. Government and commercial payers differ, commercial contracts differ from each other, and the window in the contract overrides whatever the payer's published policy says. Medicare's window for most claims is one year from the date of service; commercial windows are frequently much shorter, and ninety days is not unusual.
The start date. Usually the date of service. For an inpatient stay, often the discharge date. For a secondary claim, commonly the date the primary adjudicated, which starts a new and shorter clock weeks after the service. For a claim being refiled after a denial, sometimes a separate window measured from the denial.
The sequence. Primary, secondary and tertiary claims are on different clocks for the same encounter.
The clock's own rules. Calendar days or business days, inclusive or exclusive of the start date, and what happens when the deadline falls on a weekend.
So the deadline is computed, from attributes that live on the contract, and recomputed if the sequence changes. Storing it as a date on the claim at creation is fine as a cache; storing it as the only copy means a contract correction cannot fix the claims already in the queue.
What counts as filed
The second half of the problem is evidence. When a payer says it never received a claim, the practice's position depends entirely on what it can produce, and "our system says we sent it" is not evidence.
What is evidence, in rough order of strength: the payer's own acknowledgment of the claim, naming it; the clearinghouse's report showing the claim accepted and forwarded, with a date; your stored outbound file with its control numbers and timestamp. The first of those is worth far more than the third, which is an argument for building the acknowledgment reconciliation before the timely filing report rather than after.
This is why a claim's filing date should be the date it was accepted, not the date it was generated. A claim built on the fifth, rejected by the clearinghouse on the sixth, corrected and accepted on the twentieth, was filed on the twentieth. A system that stamps the first date tells a reassuring lie, and the queue that depends on it is under-reporting its own risk.
The queue is the whole point
The report that matters is not "claims that were denied for timely filing". That one is a post-mortem. The report that matters is claims that will be denied for timely filing unless somebody acts, ordered by how soon and how much.
Three bands, which in practice is enough:
- Approaching. Far enough out that routine work will clear it; visible so that nothing sits unnoticed.
- At risk. Close enough that it needs attention this week, with the dollar value attached so the order of work is obvious.
- Past. Already out of time. Still worth a queue, because some of these are appealable with proof of timely filing, and because the pattern in them tells you where the pipeline is leaking.
The claims that fill the at-risk band are rarely the ones anybody expected. They are the claims that went out, were rejected at the clearinghouse, and never came back — the ones with no denial, no status, and therefore no work queue of their own. A timely filing clock is, in practice, the backstop that catches everything your acknowledgment tracking missed.
What bites once it is live
The clock runs on claims nobody is looking at. Any state a claim can sit in indefinitely — pending information, held for coding, waiting on an authorisation, parked while somebody chases an eligibility problem — is a state where the deadline keeps moving. The clock has to apply to every unresolved claim regardless of state, not only to the ones in the active submission queue.
A corrected claim may be on the original clock or a new one. Payers differ, and some apply a separate, shorter window for corrections measured from the original adjudication. Model it per payer, and when in doubt use the tighter interpretation.
The denial code is not always obvious. Late filing arrives under more than one reason code, and sometimes inside a generic rejection. Mapping the ones your payers actually use — and counting them — is how you find out whether the clock is working.
Appeals have their own deadlines, and they are shorter. A denial received today is appealable for a limited period, and that is a second clock on the same claim with weeks rather than months on it. Running one and not the other means winning the argument and still not being paid.
Nobody believes the report until it is right. A timely filing report with false positives in it gets ignored within a fortnight, and an ignored report is worse than no report. The dates it is computing from have to be the accepted dates, and the windows have to come from the contracts rather than a default somebody typed in once.
How to test it
- A claim for an inpatient stay computes its deadline from the discharge date, not the admission date.
- A secondary claim computes its deadline from the primary's adjudication date and lands in the right band.
- A claim rejected and later accepted carries the later date as its filing date.
- A contract window changed from 180 days to 90 recomputes the band of every open claim under it.
- A claim parked in a non-submission state for four months appears in the at-risk band. This is the test that proves the clock covers the states nobody thinks about.
- A deadline falling on a Sunday resolves the way the contract says it does, and the test names which rule it is asserting.
What we do
We compute the deadline from the contract rather than storing it as a date on the claim, date filing from acceptance rather than generation so the number is defensible, run the clock across every unresolved claim whatever state it is parked in, and keep the acknowledgment that proves the filing date next to the claim it belongs to.
Building something that has to talk to a payer?
If any of the above is a problem you currently have, describe it and we will tell you what we would do about it.